We have commissioned and installed most prestigious and giant project for standard group‘s 15 m3/hr etp plant in masterbari, gazipur. It was a success story of minimum costing & properly running & met all require standard parameter for buyer & department of environment.
This is a successful venture of our company was to installed & Commissioned of DM Plant for sena edible oil industries, fatulla, Narayangonj.
We have successfully installed & Commissioned Of 15 m3/hr ETP Plant for MNR Design Ltd. Location of Sheepur, Gazipur, it was properly running & it was met all require standard Parameter for buyer & Department of Environment .
This is an inspired story for us, we have installed & commissioned of 15 m3/hr etp plant for plant for Deshbondhu Group, location of Konabari, Uttara. It was properly running & met all require standard parameter for buyer & department of environment.
Our company most modern etp plant of 15 m3/hr have installed & commissioned for virgo fish & agro process ltd. Company location trishal, mymensinsh, it was properly running & met all requirement standard parameter for buyer & department of environment .
These are the success story of most modern ETP plant 15 m3/hr have installed & Commissioned for NATURAL WOOL WEARS LTD. location of company Bangabandhu Road, Charabagh, Ashulia, Savar, Dhaka.
We have successfully installed & Commissioned Of 25 m3/hr ETP With UF system plant for Pretty Sweater Ltd (PSL). It is a sister concern of Pretty Group.
We have successfully installed & Commissioned Central Drinking water treatment plant for Kojima Lyric Garments, Company Location Jaydep pur, Gazipur.
Most modern ETP plant of 15 m3/hr have installed & Commissioned for Natural Sweater Village Ltd. It is a sister concern of Natural Group. it was properly running & met all requirement standard Parameter for buyer & Department Of Environment.
We have commissioned and installed Water treatment Plant for Heidelberg Cement Bangladesh Limited, Company Location Chittagong.
We have successfully installed & Commissioned Of 60 m3/hr Reverse Osmosis Plant for sena edible oil industries, fatulla, Narayangonj.
Another 120 m3/hr water treatment plant successfully installed & Commissioned for sena edible oil industries, fatulla, Narayangonj.
These are the success story of most modern ETP plant 15 m3/hr have installed & Commissioned for IRIS Fashions Limited (Sweater Unit). Comapny Location Zerabo, Ashuliya.
We have successfully installed & Commissioned Of 10 m3/hr Reverse Osmosis Plant for C.P Bangladesh Co. Ltd (Chittagong Feed Mill), Comapny Location Mireshorai, Chittagong.
Another 15 m3/hr ETP Plant have installed & Commissioned for T-Desing Knit wear Ltd. Comapny Location Mawna, gorgoriy muster bari, Gazipur.
We have successfully installed & Commissioned Of 5.0 m3/hr Central drinking system for Unicorn sweater Limited. Company Location Jamgora, Ashulia, Savar.
These are the success story of installed & Commissioned 50 m3/hr Water Treatment Plant (Iron Removed and Softener Plant) for Nipa Group, Company Location Dhokhin Khan, Khachpura, Uttara.
Another 50 m3/hr ETP Plant successfully installed & Commissioned for Nipa Group. Company Location Dhokhin Khan, Khachpura, Uttara.
We have successfully installed & Commissioned Of 15 m3/hr ETP Plant for Diganta Sweaters Ltd. Company Location in Naoujoor, Tangail Road, Chandana, Gazipur.
These are the success story of most modern ETP plant 15 m3/hr have installed & Commissioned for Zon Ron Sweaters Limited. Company Location in Nischintopur Bus Stand Ashulia,Savar.
These are the success story of installed & Commissioned 20 m3/hr Water Treatment Plant with RO system for MASAFI Group. Company Location Hatu Bhanga Road, Gorai, Mirzapur.